Error 1
Overflow
• A result is outside the calculator range
(9.9999999999999E99).
• Tried to divide by zero (can occur internally).
• Tried to compute 1/x when x is zero.
• Statistics worksheet: a calculation included X or Y
values that are all the same.
Error 2
Invalid
argument
• Tried to compute x! when x is not an integer 0-69.
• Tried to compute LN of x when x is not > 0.
• Tried to compute yx when y < 0 and x is not an
integer or the inverse of an integer.
• Tried to compute when x < 0.
• Amortization worksheet: tried to compute BAL,
PRN, and INT when P2 < P1.
• Depreciation worksheet: a calculation included
SAL > CST.
Error 3
Too many
pending
operations
• More than 15 active levels of parentheses were
tried in a calculation.
• A calculation tried to use more than 8 pending
operations.
Error 4
Out of range
• Amortization worksheet: the value entered for P1
or P2 is outside the range 1-9,999.
• TVM worksheet: the P/Y or C/Y value 0.
• Cash Flow worksheet: the Fnn value is outside the
range 0.5-9,999.
• Bond worksheet: the RV, CPN, or PRI value _0.
• Date worksheet: the computed date is outside the
range January 1, 1950 through December 31, 2049.
• Depreciation worksheet: the value entered for:
declining balance percent 0; LIF 0; YR _ 0; CST <
0; SAL < 0; or M01 1 M01 13.
• Interest Conversion worksheet: the C/Y value 0.
• The DEC value is outside the range 0-9.
x
Error 5
No solution
exists
• TVM worksheet: the calculator computed I/Y when
FV, (N Q PMT), and PV all have the same sign.
(Make sure cash inflows are positive and outflows
are negative.)
• TVM, Cash Flow, and Bond worksheets: the LN
(logarithm) input is not > 0 during calculations.
• Cash Flow worksheet: the calculator computed IRR
without at least one sign change in the cash-flow
list.
Error 6
Invalid date
• Bond and Date worksheets: a date is invalid (for
example, January 32) or in the wrong format (for
example, MM.DDYYYY instead of MM.DDYY.
• Bond worksheet: the calculator attempted a
calculation with a redemption date earlier than or
the same as the settlement date.
Error 7
Iteration limit
exceeded
• TVM worksheet: the calculator computed I/Y for a
very complex problem involving many iterations.
• Cash Flow worksheet: the calculator computed IRR
for a complex problem with multiple sign changes
or for the BA II PLUS™ PROFESSIONAL calculator
PB/DPB with no payback period based on input
cash flow values.
• Bond worksheet: the calculator computed YLD for
a very complex problem.
Error 8
Canceled
iterative
calculation
• TVM worksheet: $ was pressed to stop the
evaluation of I/Y.
• Amortization worksheet: $ was pressed to
stop the evaluation of BAL or INT.
• Cash Flow worksheet: $ was pressed to stop
the evaluation of IRR.
• Bond worksheet: $ was pressed to stop the
evaluation of YLD.
• Depreciation worksheet: $ was pressed to stop
the evaluation of DEP or RDV.
Error Possible Causes
Error 1
Overflow
• A result is outside the calculator range
(9.9999999999999E99).
• Tried to divide by zero (can occur internally).
• Tried to compute 1/x when x is zero.
• Statistics worksheet: a calculation included X or Y
values that are all the same.
Error 2
Invalid
argument
• Tried to compute x! when x is not an integer 0-69.
• Tried to compute LN of x when x is not > 0.
• Tried to compute yx when y < 0 and x is not an
integer or the inverse of an integer.
• Tried to compute when x < 0.
• Amortization worksheet: tried to compute BAL,
PRN, and INT when P2 < P1.
• Depreciation worksheet: a calculation included
SAL > CST.
Error 3
Too many
pending
operations
• More than 15 active levels of parentheses were
tried in a calculation.
• A calculation tried to use more than 8 pending
operations.
Error 4
Out of range
• Amortization worksheet: the value entered for P1
or P2 is outside the range 1-9,999.
• TVM worksheet: the P/Y or C/Y value 0.
• Cash Flow worksheet: the Fnn value is outside the
range 0.5-9,999.
• Bond worksheet: the RV, CPN, or PRI value _0.
• Date worksheet: the computed date is outside the
range January 1, 1950 through December 31, 2049.
• Depreciation worksheet: the value entered for:
declining balance percent 0; LIF 0; YR _ 0; CST <
0; SAL < 0; or M01 1 M01 13.
• Interest Conversion worksheet: the C/Y value 0.
• The DEC value is outside the range 0-9.
x
Error 5
No solution
exists
• TVM worksheet: the calculator computed I/Y when
FV, (N Q PMT), and PV all have the same sign.
(Make sure cash inflows are positive and outflows
are negative.)
• TVM, Cash Flow, and Bond worksheets: the LN
(logarithm) input is not > 0 during calculations.
• Cash Flow worksheet: the calculator computed IRR
without at least one sign change in the cash-flow
list.
Error 6
Invalid date
• Bond and Date worksheets: a date is invalid (for
example, January 32) or in the wrong format (for
example, MM.DDYYYY instead of MM.DDYY.
• Bond worksheet: the calculator attempted a
calculation with a redemption date earlier than or
the same as the settlement date.
Error 7
Iteration limit
exceeded
• TVM worksheet: the calculator computed I/Y for a
very complex problem involving many iterations.
• Cash Flow worksheet: the calculator computed IRR
for a complex problem with multiple sign changes
or for the BA II PLUS™ PROFESSIONAL calculator
PB/DPB with no payback period based on input
cash flow values.
• Bond worksheet: the calculator computed YLD for
a very complex problem.
Error 8
Canceled
iterative
calculation
• TVM worksheet: $ was pressed to stop the
evaluation of I/Y.
• Amortization worksheet: $ was pressed to
stop the evaluation of BAL or INT.
• Cash Flow worksheet: $ was pressed to stop
the evaluation of IRR.
• Bond worksheet: $ was pressed to stop the
evaluation of YLD.
• Depreciation worksheet: $ was pressed to stop
the evaluation of DEP or RDV.